логотип компании
home Sitemapsitemap
Русский Oct 15, 2019 10:20
(GMT+3)
Latest news
Oct 14, 2019
Russian Railways, RDIF and Saudi Railway Company agree on cooperation
Oct 10, 2019
Allegro passenger numbers increased by 15.9% in nine months of 2019
Oct 09, 2019
Russian delegation discusses prospects for rail transport development with Armenian government
Oct 08, 2019
Loading volumes of freight exports to ports increased by 2.5% in January-September 2019
Oct 02, 2019
Passenger numbers on the network owned by Russian Railways increased by 4% in January - September 2019
Oct 01, 2019
Loading on the network owned by Russian Railways increased by 1% in September 2019
News archive
Home
The Company
History
Transsib during the war

Transsib during the war

In connection with the reorientation lokomotivostroitelnyh and locomotive repair plant for military products, locomotive depot began independent production of spare parts for locomotives and railcars, mastered the factory repair locomotives.

At the station Manzovka-2, on the basis of production facilities of the military unit were constructed cast-brass casting workshops with the installation of furnaces and furnace design medeplavitelnyh Giorgadze. They provided the locomotive depot Far Eastern Railway brake pads, liners boxen, rolls spool sleeves and rings, rolls piston rings, shaped and simple iron casting for the production of individual parts of locomotives and all mechanical equipment depot and cranes; bronze cast boxen and drawbar bearings and bushings, bearings slide, gage sleeve of the steam engine and other parts and all kinds of rough blanks for repair of locomotives and other mechanical equipment depot.

In Ussuriysk depot was established production of nails popular sizes that largely meets the needs of all businesses locomotive economy of Primorye. All construction groups locomotive branches formed logging teams, and Stroydvor install equipment for sawing wood. Due to this, almost completely cover the needs of all timber in locomotive economy. All this, and more, taken together, made it possible in difficult conditions of wartime solve the problem of logistics repair locomotives, mechanical equipment, buildings and structures of all objects of a locomotive economy.

On the road were organized repair decommissioned steam locomotives, old equipment, tools, recovery and production of spare parts. In the hard conditions of production standards overfulfilled in two or three times.

In depot Krasnoyarsk, Ilanskaya was organized production of military weapons for the front. In Krasnoyarsk produced flamethrowers, shells and mines. In Ilanskaya depot during the war years was made more than three hundred and three thousand mortar min.

In 1944, the station Moskovka Omsk railway locomotive depot built on 3 stalls with workshops. This was due to the fact that the depot Omsk could not cope with the repair of locomotives in a big assigned park of 150 and 100 train shunting locomotives.

screenRenderTime=0

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search