логотип компании
home Sitemapsitemap
Русский Aug 21, 2019 12:54
(GMT+3)
Latest news
Aug 09, 2019
Allegro passenger numbers up 13% in July
Aug 08, 2019
Allegro high-speed train timetable to change from 27 October 2019 as Finland switches to winter time
Aug 02, 2019
Alexander Misharin: "The Ulan Bator Railway has to double freight volumes by 2030"
Aug 01, 2019
Loading on network owned by Russian Railways amounted to 108 million tons in July 2019
Aug 01, 2019
Passenger traffic on network owned by Russian Railways increased by 2.6% in July 2019
Jul 26, 2019
Russian Railways Holding and FESCO expand Trans-Siberian LandBridge geography and launch Transit Service from Korea to Europe via Trans-Sib
News archive
Home
The Company
History
The history of railways, XX century

The history of railways, XX century

1991 - commissioned section of track with rail-sleeper grid with anchor bonding (APC)

2-kilometer-long test section was created on the path distance Eletskaya South Eastern Railway. Its operation for 10 years has demonstrated high reliability anchor-rail fastening.

The use of concrete sleepers spring staple ARS-4 is a completely new advanced technology instead of using loops, with 1KB klemno-bolt bonding.

The transition to this high-tech construction bond is many times increases the performance of the way with substantial economic efficiency - at every kilometer of ways to save at least 15 tons of metal. Also significantly increases the safety and speed of trains due to the guaranteed reliability of the spring attachment rail to the tie.

Serial introduction of a new design of the APC during overhaul of the way started in 2003. Liski (the largest railway junction in South-East highway) at the "Spetszhelezobeton" was first started production of a new type of sleepers.

In 2006 came into operation the first in the world high-tech production line automated assembly track rail-sleeper grid staple ARS-4. When operating at full capacity automated line capable of delivering 25 thousand per month. Sleepers equipped with APC. During the year it will provide overhaul 667 kilometers.

screenRenderTime=0

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search