логотип компании
home Sitemapsitemap
Jun 28, 2017 22:21
(GMT+3)
Latest news
Jun 08, 2017
Russian Railways, JSC NC Kazakhstan Temir Zholy and Belarusian Railways sign memorandum on cooperation within framework of Eurasian Economic Union
Jun 08, 2017
"The volume of international freight shipments along the East-West Corridor could exceed 127 million tons by 2020" says President of Russian Railways Oleg Belozerov
Jun 08, 2017
RZD Holding is working to create a unified information system which combines different modes of transport
Jun 07, 2017
"Russian Railways has formed a portfolio of competencies to open up international markets," says Oleg Belozerov
Jun 05, 2017
Mobile app RZD Passengers for iOS platform now uses Apple Pay technology
Jun 03, 2017
RZD Holding, JSC Sinara Group and Siemens sign agreement of intent to create new Lastochka modifications
News archive
Home
The Company
International Cooperation
International Projects
Iran

Iran

Project Tabriz - Azarshahr

March 29, 2008 the heads of railways of Russia and Iran signed a contract for the project of electrification of the railway line Tabriz - Azarshahr.

As part of this project it was electrified railway line length of about 46 km and 5 railway stations. Due to the electrification significantly reduce fuel consumption and improve the efficiency and passenger comfort.

October 13, 2012 in the city of Tabriz with participation of railways of Russia and Iran held a ceremony of completion of the project Tabriz - Azarshahr.

Project Garmsar - Ince Burun

During the talks, the heads of railways of Russia and Iran, held in January 2014 in Tehran, the Iranian side proposed JSC "Russian Railways" to consider the possibility of participating in a number of infrastructure projects in the Islamic Republic of Iran.

Among the top priorities of the Iranian side was designated a project of electrification of the railway line Garmsar - Ince Burun (length - 495 km).

In order to promote the agreements reached at the present time JSC "Russian Railways" and Iranian Railways (RAI) conducted a set of measures on the signing of a contract for the implementation of the said project.

Project Rasht - Astara (Iran) - Astara (Azerbaijan)

The aim of the project of construction of the railway line Rasht - Astara (Iran) - Astara (Azerbaijan) is a compound of the land areas of the western branch of the international transport corridor "North - South".

The main advantages of ITC "North - South" to other routes and, above all, to the traditional sea route through the Suez Canal is to reduce travel times (up to 10 days for individual correspondence), as well as improving the economic efficiency of the Trans-Caspian multimodal route, which is currently time reduces the need for repeated transshipment.

Study conditions of this project is being JSC "Russian Railways" in conjunction with RAI and the Azerbaijan Railways (JSC "BR").

screenRenderTime=1

© 2003-2017, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search