логотип компании
home Sitemapsitemap
Русский Jan 29, 2020 04:47
(GMT+3)
Latest news
Jan 24, 2020
Allegro passengers can save up to 64% on tickets
Jan 17, 2020
March Allegro tickets available with discounts of up to 44%
Jan 17, 2020
Passenger numbers between Russia and Finland reaches record high in 2019
Jan 13, 2020
International Allegro passenger numbers increase by over 15% in 2019
Jan 10, 2020
Loading volume of export goods to ports increased by 3.6% in 2019
Jan 10, 2020
Russian Railways Holding completes feasibility study on modernisation of Nagpur-Seunderabad stretch in India
News archive
Home
Press Centre
News

News

Jan 31, 2019

Volume of repair and track work at Russian Railways up 17% in 2018

In 2018, OJSC Russian Railways carried out track and repair work of all types on about 6,700 kilometres of track across the railway network, 17% more than in the previous year, including 3,400 kilometres which the Company upgraded. Existing tracks were replaced by continuous rail on over 1,900 km of stretches and more than 2,900 switches laid.

To increase through capacity, automatic blocking systems, which regulate the intervals between trains, were fitted to 152.3 km of track, while another 54 km of double and multi-track sections were equipped with two-way automatic blocking systems, which make it possible to let trains through on all tracks in both directions, depending on the situation.

As part of the programme to update railway automation and telemechanics, the Company undertook a major overhaul of 465 km of automatic blocking systems and 580 points, which are part of the electrical interlocking system.

Russian Railways carried out the most extensive infrastructure renovation on the freight lines with heaviest traffic: Kuzbass - North-West (all types of repair carried out on over 1,800 km of track), Kuzbass - Center (over 760 km of track), Kuzbass - South (more than 1,800 km) and Kuzbass - Vostok (2,200 km).

Due to the implementation of repair and track work in 2018, the Company was able to increase the passenger train speeds on more than 700 km and freight train speeds on over 665 km of track.

The modernisation of the infrastructure resulted in increased passenger train speeds on sections totaling a length of 100 km, including on the lines between Moscow - St. Petersburg, Moscow - Nizhny Novgorod, Moscow - Smolensk - Krasnoe, Moscow - Kursk – Belgorod and Moscow - Ryazhsk – Voronezh.

print version
screenRenderTime=0

© 2003-2020, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search