логотип компании
home Sitemapsitemap
Русский Dec 12, 2019 11:31
(GMT+3)
Latest news
Dec 11, 2019
Announcement about train No. 23/24 Moscow - Paris in France
Dec 11, 2019
Allegro passenger numbers increased by 17.3% in November
Dec 11, 2019
Volume of freight traffic between Russia and Azerbaijan up 26.7% in 11 months to November 2019
Dec 11, 2019
Russian Railways and Oslo port sign memorandum of intent on China - Norway - China multimodal transport
Dec 10, 2019
Heads of Russia - France Business Cooperation Council and RUIE discuss cooperation
Dec 05, 2019
CEO of Russian Railways sums up Company’s work in last 11 months
News archive
Home
Press Centre
News

News

Jul 03, 2018

RZD Holding starts work on electrification of Garmsar to Ince Burun line in Iran

The RZD Holding has began work on the electrification of the Garmsar - Inche Burun line in Iran following the ceremonial launch of the project on 2 July 2018 in Tehran.

The formal launch was attended by Oleg Belozerov, CEO and Chairman of the Board of Russian Railways, Abbas Akhoundi, Iran’s Minister of Roads and Urban Development, and Said Mohammadzadeh, President of the Iranian Railways.

“The electrification of this line will have a significant economic effect since by doubling speeds, it will increase the throughput four-fold to 10 million tons per annum. We also believe positive effects will result from increased transportation safety and security and a reduction of emissions into the atmosphere. All this will create the conditions for an increase of freight flows along the North-South International Transport Corridor (ITC) and an intensification of economic relations around the Caspian region,” said Oleg Belozerov.

Belozerov also stressed that the project was designed to be completed in 4 years and 4 months.

“I am sure that during this time a wide range of experience will be accumulated that will be useful for both our countries and become a good basis for implementing new joint projects in the field of infrastructure development,” said the head of Russian Railways.

The project provides for the electrification of the Garmsar-Ince Burun line, which has a total length of 495 km, including 203 km through mountainous terrain. The line has 31 stations and passes through 95 tunnels.

The contract also provides for the supply of electric locomotives and equipment for the maintenance of the contact network, the signalling arrangements, as well as the provision of technical support during the first year of operation.

The cost of the project is about 1.2 billion euros, including the supply of locomotives and track equipment.

The work under the contract will be performed by RZD International, a subsidiary of Russian Railways.

screenRenderTime=1

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search