логотип компании
home Sitemapsitemap
Русский Dec 15, 2019 16:18
(GMT+3)
Latest news
Dec 12, 2019
New communication systems and digital and quantum technologies will change the face of transport in the near future, says Russian Deputy Prime Minister Maxim Akimov
Dec 12, 2019
Oleg Belozerov: "In 2019, the Company will set a record for passenger transport in the last 11 years"
Dec 11, 2019
Announcement about train No. 23/24 Moscow - Paris in France
Dec 11, 2019
Allegro passenger numbers increased by 17.3% in November
Dec 11, 2019
Volume of freight traffic between Russia and Azerbaijan up 26.7% in 11 months to November 2019
Dec 11, 2019
Russian Railways and Oslo port sign memorandum of intent on China - Norway - China multimodal transport
News archive
Home
Press Centre
News

News

Feb 27, 2016

President of Russian Railways Oleg Belozerov takes part in meeting on Company's infrastructure division

RU EN

President of Russian Railways Oleg Belozerov takes part in meeting on Companys infrastructure division (s)Oleg Belozerov, President of Russian Railways, has taken part in a meeting held by the Company's infrastructure division. The meeting focused on the results of the core business units in 2015 and plans for 2016 and was held in Sochi in South Russia.

"The first thing we need to do is to increase the level and quality of our medium-term planning, the second is to increase productivity and the third is to reduce costs and equipment failures. This year should be the first one to record an improvement in the overall state of the track's technical condition, which should continue to get better in the years ahead. And we know that together with you, we can achieve that goal," said the President of Russian Railways.

The volume of repair and track work on the Russian Railways' network will increase by 23% this year compared with 2015. Repairs of all kinds in 2016 will see improvements to 6,097 kilometres of track, including upgrades to 2,144 km of track, the replacement of 1,885 km of rail lengths and 2,345,000 sets of switching points.

One of the most important directions is the railways in Eastern Russia, where the large-scale modernisation of the railway infrastructure on the Baikal-Amur Main Line and Trans-Siberian Railway now being undertaken will increase all types of repair about 1,210 kilometres.

print version
screenRenderTime=1

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search