логотип компании
home Sitemapsitemap
Русский Jun 19, 2019 21:51
(GMT+3)
Latest news
Jun 08, 2019
OJSC Russian Railways, CJSC Sinara Group and Siemens Mobility GmbH to create engineering centre
Jun 08, 2019
OJSC Russian Railways, Siemens and CJSC Sinara Group agree on supply and maintenance of 13 Sapsan trains
Jun 08, 2019
Feasibility study of high-speed Indian rail stretch should be completed by autumn 2019
Jun 06, 2019
Russian Railways and Global Ports sign Cooperation Agreement
Jun 06, 2019
Russian Railways and Intesa Sanpaolo Group sign Memorandum of Understanding
Jun 06, 2019
Russian Railways and Russia’s Ministry of Economic Development agree on development of green financing in Russia
News archive
Home
Press Centre
News

News

Apr 03, 2019

Northern Latitudinal Railway will become test ground for the most advanced construction technologies

 

 

The Scientific and Technical Council on the Practical Issues of Constructing the Northern Latitudinal Railway met at Russian Railways on 2. April 2019.

The meeting was attended by Dmitry Artyukhov, Governor of the Yamalo-Nenets Autonomous District, Vladimir Chepets, Head of the Federal Agency of Railway Transport of the Russian Federation, representatives from Gazprom, the company-concessionaire of the Northern Latitudinal Railway LLC, transport experts and Russian Railways specialists.

"The new railway line will lend additional momentum to the intensive development of resources in the Arctic region and, as a result, the development and strengthening of the Russian economy," said Oleg Belozerov, Chief Executive Officer and Chairman of the Board of Russian Railways, in his welcoming speech. "The distance will be reduced by more than 760 km, cutting delivery times for deposits from the northern regions of Western Siberia and the Tyumen region."

According to the head of Russian Railways, the construction of the Northern Latitudinal Railway poses a number of challenges to all the parties involved due to the region’s special climatic conditions.

"Innovative materials that work reliably at low temperatures should be widely used. At the same time, the long-term climate change forecast must be taken into account, because I’m convinced that this line will still be working in the next century," said Oleg Belozerov.

Council members noted that the Northern Latitudinal Railway is optimally suited for the application of technologies requiring low staff levels. In particular, the new line should be equipped with the most modern low-maintenance automation, remote control and communications systems, all of which should be based on a reliable power supply. Mechanical engineers will help to develop track machines with special modifications to enable them to function in the conditions of the Far North.

The concession agreement for the creation of the Northern Latitudinal Railway was signed in October 2018. The new line will result in a significant reduction in the length of transport routes from deposits in the northern regions of Western Siberia to the ports of the Baltic, White, Barents and Kara seas. In addition, the implementation of the NLR project will help to solve the problem of congestion on the existing southern route, which joins up with the Trans-Siberian Railway.

The project’s implementation will make possible the unhindered passage of additional traffic volumes amounting to 23.9 million tons per annum by 2025.

 

 

back to List print version
screenRenderTime=1

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search