логотип компании
home Sitemapsitemap
Русский Apr 21, 2019 03:32
(GMT+3)
Latest news
Apr 09, 2019
Allegro passenger numbers up by 18.8% in first quarter 2019
Apr 04, 2019
CEO Oleg Belozerov sums up Company’s work in first quarter
Apr 04, 2019
“The Long-Term Development Programme of Russian Railways contains all the necessary measures to solve the tasks in the Comprehensive Infrastructure Modernisation Plan,” says Company head Belozerov
Apr 03, 2019
Northern Latitudinal Railway will become test ground for the most advanced construction technologies
Apr 02, 2019
Loading volumes on the network owned by Russian Railways increased by 0.5% in March 2019
Apr 02, 2019
Passenger turnover on network owned by Russian Railways increased by 3.5% in IQ 2019
News archive
Home
Press Centre
News

News

Sep 22, 2015

An Agreement Was Signed between "RZD International" and JSC "Infrastructure Railways of Serbia" on the Reconstruction of Three Southern Sections of the Pan-European Transport Corridor X

RU EN

Today in the Republic of Serbia, additional agreement no. 2.2 to the main contract for the upgrade of the infrastructure of Serbian railways in the south for a total length of 46 497 m as part of the development of Pan-European Corridor X was signed.

The signing ceremony was held in the presence of President of JSC "Russian Railways" Oleg Beloziorov; Deputy Prime Minister of the Republic of Serbia, Minister of Construction, Transport and Infrastructure Zorana Mihajlović; and Extraordinary and Plenipotentiary Ambassador of the Russian Federation in the Republic of Serbia Alexandra Chepurina.

The document was signed by General Director of JSC "Infrastructure Railways of Serbia" Goran Maksić and General Director of "RZD International" Sergei Pavlov.

The agreement provides for the reconstruction of railway infrastructure in the three southern sections of the Pan-European Transport Corridor X with a total length of more than 46 km: Vinarci–Djordjevo, Vranjska Banja–Ristovac, and Bujanovac–Bukarevac. In accordance with the agreements reached by parties, the lower track structure will be completely replaced and the signaling system (alarm–centralization–lock), telecommunications, and contact network will be reconstructed.

In the project, "RZD International" will use advanced Russian technologies on the track, increasing performance and significantly reducing the time of the work. It is important to note that the reconstruction of the areas will be in the "window" mode and the complete cessation of trains will be unnecessary.

After the signing ceremony, President of JSC "Russian Railways" O.V. Beloziorov held working meetings with President of the Republic of Serbia Tomislav Nikolić and Prime Minister of the Republic of Serbia Aleksandar Vučić.

back to List print version
screenRenderTime=0

© 2003-2019, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search