логотип компании
home Sitemapsitemap
Русский Jul 23, 2018 16:33
(GMT+3)
Latest news
Jul 20, 2018
Train organisers transported more than 5.2 million fans to matches during 2018 FIFA World Cup Russia™
Jul 16, 2018
Russian Railways and Chongqing ready to expand freight network from China to Europe
Jul 11, 2018
Loading of export freight to ports increased by 5.4% in 1H 2018
Jul 10, 2018
Passengers on RZD holding’s long-distance trains have bought about 65 000 Official Licensed Products of the 2018 FIFA World Cup Russia™
Jul 09, 2018
Russian Railways agrees with final decision of the meeting of CEOs of European Railways
Jul 09, 2018
Russian Railways and Österreichische Bundesbahnen (Austrian Federal Railways) begin new form of cooperation
News archive
Home
Press Centre
News

News

Sep 28, 2017

Railway bridge over the Lena River to be completed before the end of the year

The construction of the railway bridge on the Baikal Amur Main Line across the Lena River is planned for completion by the end of 2017.

The new bridge will ensure the simultaneous unhindered passage of trains along two parallel tracks on this section.

At present, the builders are laying the ballastless bridge road bed. In accordance with the project’s main technical solutions, the new bridge will have 4 span structures with lengths varying from 45 metres to 132 metres.

The total length of the bridge is 417 m. Its construction consists of the so-called northern version, which allows the structure to be operated under the difficult natural and climatic conditions of Russia’s high latitudes.

The construction of the new railway bridge across the River Lena began two years ago and is part of a large-scale investment project to modernise Russia’s railway system in the Far Eastern part of the country.

The bridge will increase the carrying capacity of the Lena-Severobaikalsk section and thus meet the demand of the dynamically growing freight volumes along the Baikal-Amur Mainline and on the entire Far Eastern rail system.

The facility is due to be commissioned in 2018, when the construction of the contact network on the bridge will be completed.

This is the only railway bridge across the Lena River. The facility is located in the city of Ust-Kut on the stretch between Lena-Vostochnaya and the Chechnychny siding.

The Baikal Amur Main Line crosses 11 major rivers and has more than 2,200 large, medium and small bridges.

print version
screenRenderTime=1

© 2003-2018, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search