логотип компании
home Sitemapsitemap
Oct 21, 2017 02:15
(GMT+3)
Latest news
Oct 19, 2017
Russian Railways successfully placed Rouble Eurobond
Oct 14, 2017
Loading of export freight from ports increases by almost by 6% in 3 quarters of 2017
Oct 12, 2017
Freight container transportation on Russian Railways’ network increased by 24.4% in first three quarters of 2017
Oct 09, 2017
Shipment volumes of Pacific seafood by accelerated trains increases 1.4 times in first three quarters of 2017
Oct 02, 2017
Passenger traffic on Russian Railways’ network up 6.1% in September 2017
Oct 02, 2017
Loading on the network of Russian Railways increased by 1.8% in September 2017
News archive
Home
Press Centre
News

News

Mar 14, 2017

Kaliningrad-Yuzhny railway station for the World Cup will be ready by end of 2017

RU EN

Work on the complex reconstruction and modernisation of the Kaliningrad-Yuzhny railway station will be completed by the end of 2017, according to participants of an inter-agency meeting on the preparation of railway station complexes for the 2018 World Cup.

The meeting was held in Kaliningrad, with representatives from Russian Railways, the government of the Kaliningrad region and city administration, the Autonomous Non-Commercial Organisation Directorate Kaliningrad 2018 and other organisations in attendance.

"From the point of view of Russian Railways, the modernisation of the station infrastructure is being carried out in a systemic manner. After reconstruction, the station will meet all modern standards with regard to transport security and offer barrier-free environment for passengers with low mobility and comfortable and convenient waiting rooms," said Vitaly Votolevsky, the head of the Rail Station Directorate at Russian Railways.

Kaliningrad station will be equipped with an integrated security system, including metal detectors, X-ray machines for baggage screening, and 209 new digital video cameras throughout the inner and outer perimeter of the station complex. Security checks will begin directly on the station forecourt.

Particular attention is being paid to creating a barrier-free environment for passengers with low mobility. Direct access to the station is provided for low-mobility passengers from the station forecourt. The station complex is equipped with special lifting mechanisms, including those connecting the passenger platforms and tunnels.

After the work is completed on the first floor of the station, a special rest room will be opened for less mobile passengers.

In addition, a new navigation and voice notification system will be installed, including in English, as part of the preparation of the station complex for the 2018 FIFA World Cup.

In the long-distance ticket office, electronic queue terminals will be installed to improve services to passengers and reduce their waiting time.

print version
screenRenderTime=1

© 2003-2017, Russian Railways
Mass Media Registration Certificate El. No. ФС77-25927
When using any material from the site reference to rzd.ru is obligatory

The Company | Passengers | Freight | Press Centre | Investor Relations | Contacts | Search